Watershed Jhalawar

Baneth sagoni 04068500 baneth baneth 04068400 barwad patlon 04061600 barwad bambooliya 04062200 barwad chachorni 04061900 barwad kheri 04061700 barwad barwad 04062100. Generation, through integrated watershed development works for natural resource management and drought proofing. itc is keen to study the impact of the watershed development programme in bhilwara, pratapgarh and jhalawar districts of rajasthan by a third party evaluating agency (ea) against the original aims and objectives set for the projects. ii.. About us. agriculture portal improved on-farm water use efficiency reduced water-intensive cropping patterns and using the resultant savings for economic purposes outside of agriculture in support the state's water policy of reducing water consumption by the agricultural sector. 2. jhalawar: watershed: agriculture, horticulture.







Ground water scenario district jhalawar, rajasthan 1.0 introduction jhalawar district is located between 23o 45� 20� and 24o52�17� north latitude and 75o 27� 35 � and 76o56�48� east longitude covering an area of 6928 sq.km.the district is part of kota division and is divided into five sub-divisions namely aklera, khanpur,. The dam capacity of this project is 490 million cubic metre. after completion, 317 million cubic metres of water will be available for irrigation. along with irrigation, this project will also provide 50 million cubic metres of water to quench thirst of 1,821 villages of baran, jhalawar and kota districts.. 1 i. introduction a. purpose of the report 1. rajasthan urban sector development investment program (rusdip) is intended to optimize social and economic development in 15 selected towns in the state, particularly district.

watershed jhalawar